S 149th St & S 150th St Water Main Replacement

Project Overview

Design Phase: The existing 6” cast iron water main along S 149th St and along S 150th St is undersized and has reached its useful life. The looped water main along 150th will be replaced from Macadam Rd to the Cul-de-sac. The semi-looped line along 149th will be converted to a fully looped line and will be replaced from Macadam Rd to 57th Ave S. The improvements will see the installation of more than 1,200 feet of 8” ductile iron water main, improving water quality and fire flow availability. Along with various minor improvements, both streets will be fully repaved at the conclusion of the project.

 

Construction Phase: Tentative start shall be first week of April. Along with the mainline being replaced, water services to individual homes shall be replaced as well. The contractor shall notify residents for any minor water shut downs. We greatly appreciate your patience as we upgrade the infrastructure in your neighborhood. Check back here for updates. Construction is expected to be completed and accepted by the City in Q3 of 2025.

 

Signup for Email Updates

Follow this link to sign-up for project updates.

 

Project Contacts