Government

PERMIT CENTER HOURS

In-person, phone and email assistance hours

Monday – Friday, 8:30 am – 4:00 pm.

In-person assistance hours

Monday – Thursday, 8:30 am – 4:00 pm.

Permit Center Address

6300 Southcenter Blvd., #100
Tukwila, WA 98188

CONTACT US

Permit Center

✉️ Permits@TukwilaWA.gov

Building Division

✉️ Building@TukwilaWA.gov

Planning Division

✉️ Planning@TukwilaWA.gov

Engineering (Development)

✉️ Engineering@TukwilaWA.gov

Call Us

☏ (206) 431-3670

Fax: (206) 431-3665

Click here for information on King County Construction and Demolition Materials Management.

Construction Permits

(Building, Electrical, Fire, Mechanical, Plumbing, Public Works, Signs, Special Events, Wireless, etc.)

View Building Codes in effect as of March 15, 2024

 

Building Permit Checklists, Fees, Bond Templates

Building Permit Fees

Performance Measures/Warranties/Bonds

Building Permit Checklists

Building Permit Tips + Informational Docs

Tukwila Municipal Code – Title 16 – Buildings and Construction, CHAPTER 16.04 BUILDINGS AND CONSTRUCTION 16.04.020 Codes Adopted.

A. Effective March 15, 2024, established by the State Building Code Council, the specified editions of the following model codes are adopted by reference as if fully set forth and as numerated in Chapter 19.27 RCW:

  • 2021 International Building Code with statewide amendments ICC/ANSI A117.1-09, Accessible and Usable Buildings and Facilities, with statewide amendments.
  • 2021 International Residential Code with statewide amendments.
  • 2021 International Mechanical Code with statewide amendments.
  • 2021 International Fuel Gas Code with statewide amendments (part of the International Mechanical Code (IMC) adoption).
  • 2021 Liquefied Petroleum Gas Code (NFPA 58).
  • 2021 National Fuel Gas Code (NFPA 54) (for LP Gas installation only).
  • 2023 National Electrical Code with statewide amendments.
  • 2021 Uniform Plumbing Code with statewide amendments (Includes adoption of Appendices A, B, I and M).
  • 2021 Washington State Energy Code.
  • 2021 International Existing Building Code with statewide amendments found in the IBC.
  • 2021 International Swimming Pool and Spa Code.

B. The International Building Code, 2021 Edition, as published by the International Code Council and as amended and adopted by the State of Washington. The following amendments are specifically adopted:

    1. Work exempt from a building permit. Section 105.2 of the International Building Code, 2021 Edition, is amended to include provisions regarding the following work that is exempt from a building permit:

    • a. Work performed by the City of Tukwila and located in City of Tukwila right-of-way; work performed by Washington State Department of Transportation and located in WSDOT right-of-way to include public utility towers and poles, mechanical equipment not specifically regulated in this code, hydraulic flood control structures including levees; provided that any structure or building constructed in a municipal or state right-of-way and intended to be used as any occupancy classification of the State Building Code is not exempt from the provisions of this code or the related permit requirements.
    • b. One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area does not exceed 120 square feet, and such structure is outside of and entirely separated, as prescribed by Code, from any existing building on the premises.
    • c. Fences not over 6 feet high.

C. The International Residential Code, 2021 Edition as published by the International Code Council and as amended and adopted by the State of Washington. The following amendments are specifically adopted:

    1. Work exempt from a building permit. Section R105.2 of the International Residential Code, 2021 Edition, is amended to include provisions regarding the following work that is exempt from a building permit:

    • a. One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area does not exceed 120 square feet, and such structure is outside of and entirely separated, as prescribed by Code, from any existing building on the premises.
    • b. Fences not over 6 feet high.

D. The Uniform Plumbing Code, 2021 Edition, published by the International Association of Plumbing and Mechanical Officials, as amended and adopted by the State of Washington. The following amendments are specifically adopted:

    1. All reference to and definition of “authority having jurisdiction” is deemed to refer to and shall mean the City of Tukwila Building Official.
    2. Water Supply and Distribution. Cross connection control for premises isolation related to the City’s public water system shall be in accordance with the City of Tukwila Public Works Department’s “Development Guidelines and Design and Construction Standards.” Cross connection control for premises isolation related to water purveyors outside of the City of Tukwila water system shall be in accordance with that water purveyor’s policies and standards.
    3. Sanitary Drainage. Side sewer, private sewer main extensions beyond a point defined in the plumbing code as the building drain, and required grease interceptors all within the City’s sewer districts shall be in accordance with the City of Tukwila Public Works Department’s “Development Guidelines and Design and Construction Standards,” in conjunction with the Uniform Plumbing Code requirements. Sanitary drainage, side sewers, private sewer main extensions beyond the building drain and grease interceptors outside the Tukwila sewer district shall be in compliance with that purveyor’s policies and standards.

E. The Washington Cities Electrical Code. Article 80.3 National Electrical Code: The 2023 Edition of the National Electrical Code (NFPA 70) is adopted by reference as if fully set forth.

    1. Article 85.11 of the National Electrical Code, sections (A), (B) and (C), is amended entirely and replaced as follows: The authority having jurisdiction within the City of Tukwila shall mean the Building Official, and shall include the Chief Electrical Inspector or other individuals or jurisdictions when designated by the Building Official. All references to “Code Official” shall mean the City of Tukwila Building Official or designee. (Ord. 2705 §2, 2023; Ord. 2702 §2, 2023; Ord. 2648 §2, 2021;Ord. 2171 §1 (part), 2007;)

Related Building Code information is available on the International Code Council web site and the Washington State Building Code Council web site.

Public Works Permits Checklists + Fees

Public Works Fees

Permit Checklists

Supplementary Forms

Templates

To pick up a Temporary Hydrant Meter:
Contact Jason Bates, Water Superintendent, Tukwila Water Dept. at (206)433-1863 (Office) or (206)396-8235 (Cell) Mon-Thurs. If unable to reach Jason contact Bryan Still, Operations Manager, at (206)571-6308 (Cell).
The meter may be picked up at 600 Minkler Blvd, Tukwila.

Fire Permits Checklists + Fees

Fire Permit Fees

Fire Permit Checklists

Effective January 1, 2023, the City of Tukwila is contracting with Puget Sound Regional Fire Authority (Puget Sound Fire) for Fire and EMS services. Development and new construction permits and inspections are now administered by Puget Sound Fire’s Community Risk Reduction Division, however, all applications and inspection requests must still be made through the City of Tukwila’s permitting website. All permits and approved plans are required to be on-site at the time of inspection. For more information, contact Puget Sound Fire at (253) 856-4400 or by email at fireprevention@pugetsoundfire.org or permits@tukwilawa.gov.

Effective March 1st, 2023, the updated Fire Protection codes and updated Fire Fee Schedule will be in effect. For more information, please go to the Tukwila Fire Marshal’s Office’s website via the following link: FIRE DEPARTMENT

Schedule your inspection

Building, Fire, and Public Works Permit Inspections

All Building, Fire, or Public Works inspections must be scheduled online prior to 5:00 PM for next day, or for the next available inspection.

Planning inspections must be requested at least three days in advance. Planning staff will coordinate to confirm the inspection and may request to re-schedule based upon staff availability.

For detailed steps on how to schedule your inspection, please view the instructions below.

How to schedule a Building (D, EL, M, MISC, PG, S, SPEC or W) or Public Works (PW or PWF) Inspection

How to schedule a Fire Inspection

To request inspections during OFF HOURS, please fill out this form.

Permit Center Hours

In-office hours, Phone and Email assistance:

Monday – Friday, 8:30 am – 4:00 pm.

In-person assistance hours

Monday – Thursday, 8:30 am – 4:00 pm.

Permit Center Address

6300 Southcenter Blvd., #100
Tukwila, WA 98188

 

Contact Us

Permit Center

✉️ Permits@TukwilaWA.gov

Building Division

✉️ Building@TukwilaWA.gov

Planning Division

✉️ Planning@TukwilaWA.gov

Engineering (Development)

✉️ Engineering@TukwilaWA.gov

Call Us

☏ (206) 431-3670

Fax: (206) 431-3665